The Kitchen Design Center handles everything from the design to the install.  The following are the steps in this process:
  1. Schedule an appointment for an in your home measure we charge $150 for this service and it is applied to your cabinet order.  We take pictures of your current kitchen and take measurements. During this time you'll have the chance to discuss your wants, needs and desires for your new kitchen.   Your vision is extremely important to us and giving you the kitchen that you desire is what we strive for.  We also discuss your budget and your timeframe. This is a complementary meeting.

  2. When we have completed the design we send it to you via email with color renderings of your new kitchen along with the Proposal for your review and comment.

  3. We schedule a meeting at our showroom and work together on the layout.  We review each cabinet down to how many roll out shelves are included.  We can change whatever cabinets you would like.  If you would prefer a four drawers instead of three we can make the change right there.
  4. It is during this time we discuss your appliances, countertops and flooring options.  We partner with Filco Discount Appliance and several countertop fabricators to assist you in this part of the remodel.  We have programs that can show you how your cabinet finish looks on different door styles.  We can change the handles to give the cabinets a totally different look as well as the edge profile.  This  helps you envision exactly what your new kitchen will look like.

  5. If you are working with a contractor or building a new home we will meet with the contractors and review the details of your kitchen.

  6. The Cabinets are ordered and take approximately four (4) to five (5) weeks.  We notify you within 10 days via email the expected week of delivery.  We remind you that the cabinets will be delivered into your garage. 


  7. Cabinets are delivered and we schedule the demo (if you have a current kitchen) and the install.

  8. Our part of the process takes two to three days.  Then you are ready for templeting for your new countertop.  Countertops take 8 days from template to install. If you are getting new floors this would be the time to have them installed.  Countertops are installed and we call for the appliance and plumbing connect.  Then you are eating in your new kitchen. 